Home
SERVICE AREASLocal Expertise, Regional Reach
Bernalillo County
Sandoval — Core
Sandoval — Foothills
Santa Fe & East
Valencia County
View Specialty Page
AboutPortfolioContact
Locations
Grading & Earthwork · Los Lunas, NM

Grading & Earthwork in Los Lunas, NM

Mass grading, excavation, embankment, and subgrade preparation for new development — performed under one NM CID license (#385363) to Village of Los Lunas Public Works expectations and established 95% compaction practice for expansive soils and monsoon drainage.

NM CID Lic #385363 — Licensed, Bonded & InsuredVillage of Los Lunas Public Works / 95% Compaction FocusServing Los Lunas from Albuquerque HQ
Grading & Earthwork in Los Lunas

Grading & Earthwork Built for Los Lunas Conditions

Los Lunas sits at approximately 4,860 feet in the Rio Grande Valley along I-25, NM 6, and Main Street. New residential, commercial, and roadway projects require precise mass grading, excavation, embankment, and subgrade preparation that meet Village of Los Lunas Public Works expectations and common practice of 95% of maximum density (ASTM D1557) under pavements and structures. Expansive clays in Valencia County swell and shrink with moisture changes; monsoon storms demand positive drainage and erosion control. As a licensed contractor serving Los Lunas, we deliver grading and earthwork that meets Village review and inspection standards for long-term performance under local soil and climate conditions.

95%

Common Subgrade/Fill Compaction — ASTM D1557 Practice

Village Public Works & Development Review

Grading and drainage plans are reviewed by the Village of Los Lunas. Construction activities must not increase flood or erosion damage potential to adjacent properties. We coordinate plan review, material testing, and inspection with Village Public Works and Community Development under our NM CID license so finished grades support subsequent base, pavement, or building work.

Compaction Practice & Subgrade Preparation

Local geotechnical recommendations and project specifications commonly require scarify, moisture-condition, and compact the upper subgrade and structural fill to 95% of maximum density (ASTM D1557), with moisture near optimum and lifts limited (often 8 inches loose). Proof-rolling identifies soft spots before base or pavement placement. NMDOT Standard Specifications are frequently referenced for materials and methods.

Expansive Clays & Moisture Conditioning

Valencia County soils often include expansive clays that swell when wet and shrink when dry. Thorough moisture conditioning, controlled lift thickness, and adequate compaction are essential so finished pads and subgrades resist heave, settlement, and moisture-related failure under pavements and structures.

Monsoon Drainage & Erosion Control

Summer monsoons deliver intense, short-duration rainfall. Positive drainage away from structures, temporary and permanent erosion control, and finished grades that convey runoff without increasing damage to adjacent properties are critical during and after earthwork.

Los Lunas Grading & Earthwork Process

How Grading & Earthwork Projects Run in Los Lunas

A clear process designed around Village of Los Lunas Public Works review, 95% compaction practice, and expansive-soil / monsoon performance requirements.

1
Step 1

Project Scope & Site Evaluation

We review the grading plan, geotechnical data, cut/fill balance, drainage requirements, and expansive-soil recommendations, then define the full earthwork scope under our NM CID license.

2
Step 2

Design Coordination & Plan Package

Plans address mass grading, embankment, subgrade preparation, and erosion control to Village expectations and geotechnical recommendations. Submittals go through the Village for review.

3
Step 3

Permits, Approvals & Pre-Construction

We secure required grading and related approvals, confirm material sources and testing protocols, and schedule work around development phasing, weather windows, and Village inspection.

4
Step 4

Clearing, Earthwork, Compaction & Testing

Crews clear and grub, excavate and place embankment in controlled lifts, moisture-condition and compact to the specified density (commonly 95% ASTM D1557 under pavements/structures), prepare subgrade, proof-roll, and perform or coordinate density/moisture testing.

5
Step 5

Final Grades, Inspection & Close-Out

Finished grades are verified to design elevations and cross-sections. Punch list, final inspections, testing documentation, and clear handover for subsequent base, pavement, or building work.

Our Albuquerque headquarters is approximately 25–35 minutes via I-25, allowing reliable mobilization and consistent project supervision for Los Lunas grading and earthwork sites.

Los Lunas Regulations

Los Lunas Grading & Earthwork — Standards & Practical Notes

Practical guidance for grading and earthwork in Los Lunas. Confirm current requirements with Village of Los Lunas Public Works and Community Development before finalizing scope.

Per Village of Los Lunas Public Works / Community Development

What standards govern grading and earthwork in Los Lunas?

Grading and drainage plans are reviewed by the Village of Los Lunas. Construction must not increase flood or erosion damage potential to upstream, downstream, or adjacent properties. Local geotechnical recommendations and project specifications commonly require 95% of maximum density (ASTM D1557) under pavements and structures, with moisture near optimum. NMDOT Standard Specifications are frequently referenced for materials and methods.

Source: Village of Los Lunas practice / local geotechnical recommendations

How do expansive clays affect earthwork?

Valencia County soils often include expansive clays that swell when wet and shrink when dry. Scarify, moisture-condition, and compact the upper subgrade and structural fill to the specified density (commonly 95% ASTM D1557). Controlled lift thickness and proof-rolling help identify soft spots and reduce heave and settlement risk under pavements and structures.

Source: Local Valencia County soil performance

What drainage and erosion-control requirements apply?

Grading or paving on any lot shall not increase damage potential from the 100-year design storm or from erosion and sedimentation from smaller storms. Erosion-control plans address all phases from initial grading through final occupancy. Positive drainage and temporary/permanent BMPs are essential during monsoon season.

Source: Village of Los Lunas drainage and erosion-control practice

What climate factors should developers plan for?

At approximately 4,860 feet, Los Lunas experiences intense summer monsoons, high UV, and temperature extremes. Moisture conditioning, adequate compaction, positive drainage, and erosion control are essential so finished grades and subgrades perform before base and pavement are placed.

Source: Local Rio Grande Valley pavement and site performance

Los Lunas Reviews

Los Lunas Grading & Earthwork Feedback

Feedback from recent grading and earthwork projects in Los Lunas.

5.0

18 verified reviews

Mass Grading / Subgrade Prep

“They took care of the mass grading and subgrade for our I-25 corridor phase with proper moisture conditioning for the clays and 95% compaction. Proof-roll passed, grades were tight, and Village inspection went smoothly. The streets went down without issues.”

Developer

I-25 / East Los Lunas Growth Area

Site Grading / Embankment

“NM 6 commercial pad and parking subgrade. Moisture control and density met expectations on the valley soils, and the surface was ready for base on schedule. Professional crew and clear documentation.”

Project Manager

NM 6 / Main Street Corridor

Service Areas

Grading & Earthwork — Also Offered In

Professional grading & earthwork available throughout our regional service network in central New Mexico.

Looking for grading & earthwork outside Los Lunas? We serve the greater metro and surrounding communities under our NM CID license.

FAQ

Grading & Earthwork FAQ — Los Lunas

Yes. Patriot Asphalt and Construction holds an active NM CID license (#385363), is bonded and insured, and serves Los Lunas from our Albuquerque headquarters.

Grading and drainage plans are reviewed by the Village of Los Lunas. Construction must not increase flood or erosion damage potential to adjacent properties. Local practice commonly requires 95% of maximum density (ASTM D1557) under pavements and structures, with moisture near optimum. NMDOT specifications are often referenced for materials.

Valencia County soils often include expansive clays. Scarify, moisture-condition, and compact the upper subgrade and structural fill to the specified density (commonly 95% ASTM D1557). Controlled lifts and proof-rolling reduce heave and settlement risk under pavements and structures.

Grading or paving shall not increase damage potential from the 100-year design storm or from erosion and sedimentation. Erosion-control plans address all phases from initial grading through final occupancy. Positive drainage is essential during monsoon season.

At approximately 4,860 feet, intense summer monsoons, high UV, and temperature extremes require moisture conditioning, adequate compaction, positive drainage, and erosion control so finished grades and subgrades perform before base and pavement are placed.

Duration depends on cut/fill volume, soil conditions, weather, and Village review/inspection schedules. After plans and permits are approved, mid-size residential or commercial grading packages are often measured in weeks. We publish a realistic schedule at contract.

We serve all of Los Lunas, including the I-25 corridor, NM 6 and Main Street areas, and surrounding Valencia County communities within our service radius.

Free Consultation

Start Your Los Lunas Grading & Earthwork Project

Free, detailed estimate from our team serving Los Lunas. Licensed, bonded, and insured — NM CID #385363.

Get In Touch

Service Area

Serving Los Lunas — HQ: 5901-J Wyoming Blvd NE, Suite 134, Albuquerque, NM 87109

Response Time

Mon–Sat: 8:00 AM – 6:00 PM

★ Licensed, Bonded & Insured · Bonded & Insured · Est. 2016