HomeAboutPortfolioContact
Asphalt Overlay & Resurfacing
Pavement Preservation Specialist

Asphalt Overlay & Resurfacing

Asphalt overlay and mill-and-fill resurfacing — restoring deteriorated pavement to a smooth, functional surface at a fraction of full reconstruction cost.

Milling & Overlay Available1.5" to 3" Overlay ThicknessInterlayer Systems AvailableFree Assessment
Service Overview

When Overlay Is the Right Solution

Asphalt overlay is appropriate when the existing pavement has adequate base support but the asphalt surface is severely deteriorated — rutting, raveling, extensive cracking — and cannot be corrected with patching and seal coat. Overlay provides a new wearing surface without the cost of removing the existing pavement. The key requirement: the base must be structurally sound. We assess base condition before recommending overlay to ensure it will last.

  • Milling of existing asphalt surface to control elevation and improve bond
  • Edge milling at curbs and inlets to maintain drainage grades and flush transitions
  • SAMI or fabric interlayer systems available to reduce reflective cracking through overlay
  • Hot mix asphalt overlay in specified thickness and compacted to density specification

10–15 Years

Overlay Life Extension

30–50%

Cost vs Reconstruction

1.5–2" Standard

Milling Depth

Mill-and-Fill vs. Straight Overlay

A straight overlay raises the final pavement elevation, which can create issues at curbs, drainage inlets, building entrances, and utility covers. Milling removes the top 1.5–2 inches of existing asphalt before overlay, maintaining existing elevation and providing a roughened surface for superior bond. We recommend milling whenever elevation change would create conflicts with existing features.

Est. 2016
EL

Patriot Asphalt and Construction

Albuquerque, NM · Licensed, Bonded & Insured · Bonded & Insured

FAQ

Asphalt Overlay FAQ

If your pavement has widespread alligator cracking, significant base failure areas (soft spots, pumping), or rutting deeper than 3/4 inch, reconstruction is likely required. If cracking is primarily surface cracking and the base is sound, overlay is appropriate. We assess this during our free pavement evaluation.

Standard overlay reduces but does not eliminate reflective cracking from underlying cracks. Crack filling before overlay and installation of a fabric or SAMI interlayer system significantly reduces reflective cracking. We'll recommend the right approach based on your existing crack pattern.

Minimum effective overlay thickness is 1.5 inches. Standard commercial parking lot overlays are 2 inches. Overlays on roads with truck traffic should be 2.5–3 inches. Thinner overlays fail prematurely, especially in New Mexico heat.

Free Consultation

Get Your Overlay Estimate

Free pavement assessment and overlay proposal throughout Greater Albuquerque Area.

Get In Touch

Service Area

Albuquerque · Albuquerque · Greater Albuquerque Area

Response Time

Mon–Sat 7am–6pm

★ Licensed, Bonded & Insured · Bonded & Insured · Est. 2016